>
The Vindication of Dr. Bhattacharya
Lessons from the 2025 European Power Grid Failure
Surprise, Surprise: Bibi Discovers "Secret Iranian Nuclear Weapons Facility" in Iran
Tetris founder's family village is collapse-proof, remote offgrid-topia
Cab-less truck glider leaps autonomously between road and rail
Can Tesla DOJO Chips Pass Nvidia GPUs?
Iron-fortified lumber could be a greener alternative to steel beams
One man, 856 venom hits, and the path to a universal snakebite cure
Dr. McCullough reveals cancer-fighting drug Big Pharma hopes you never hear about…
EXCLUSIVE: Raytheon Whistleblower Who Exposed The Neutrino Earthquake Weapon In Antarctica...
Doctors Say Injecting Gold Into Eyeballs Could Restore Lost Vision
Dark Matter: An 86-lb, 800-hp EV motor by Koenigsegg
Spacetop puts a massive multi-window workspace in front of your eyes
Panasonic is working on increasing lithium-ion cell production at the Tesla Gigafactory. The three new lines (on top of 10 already installed) were expected to go online by the end of this year.
The latest reports are that all 13 lines will be ready earlier (but no exact timeline details were provided) as Panasonic is trying to not block Tesla with another bottleneck. Tesla is in an urgent need to deliver as many Model 3 as possible.
Yoshio Ito, head of Panasonic's automotive business said:
"The bottleneck for Model 3 production has been our batteries. They just want us to make as many as possible."
With three new lines, production capacity should be about 35 GWh annually (in August, the factory was at about 20 GWh).
Originally, it was planned that 30% of battery cells will be for energy storage systems (Powerpacks and Powerwalls), but according to article, batteries for Model 3 are now prioritized.