>
Mini quantum battery charges a million times faster than it discharges
Tom Homan Puts Birthright Citizenship Into Perspective as a National Security Issue (VIDEO)
IRS holds $4.75 billion in unclaimed taxpayer overpayments as CBP delays tariff refunds
DARPA O-Circuit program wants drones that can smell danger...
Practical Smell-O-Vision could soon be coming to a VR headset near you
ICYMI - RAI introduces its new prototype "Roadrunner," a 33 lb bipedal wheeled robot.
Pulsar Fusion Ignites Plasma in Nuclear Rocket Test
Details of the NASA Moonbase Plans Include a Fifteen Ton Lunar Rover
THIS is the Biggest Thing Since CGI
BACK TO THE MOON: Crewed Lunar Mission Artemis II Confirmed for Wednesday...
The Secret Spy Tech Inside Every Credit Card
Red light therapy boosts retinal health in early macular degeneration

Panasonic is working on increasing lithium-ion cell production at the Tesla Gigafactory. The three new lines (on top of 10 already installed) were expected to go online by the end of this year.
The latest reports are that all 13 lines will be ready earlier (but no exact timeline details were provided) as Panasonic is trying to not block Tesla with another bottleneck. Tesla is in an urgent need to deliver as many Model 3 as possible.
Yoshio Ito, head of Panasonic's automotive business said:
"The bottleneck for Model 3 production has been our batteries. They just want us to make as many as possible."
With three new lines, production capacity should be about 35 GWh annually (in August, the factory was at about 20 GWh).
Originally, it was planned that 30% of battery cells will be for energy storage systems (Powerpacks and Powerwalls), but according to article, batteries for Model 3 are now prioritized.