>
Washington's Dept of Health just quietly issued a Covid vaccine standing order...
The day after his fiery Senate hearing, RFK Jr. revealed the exact reasons for firing CDC Director
47 shares a video about vaccines to Truth. Caption: "They're all poison."
Stephen Goodson (1948-2018) served as director of the South African Reserve Bank from 2003 to 2012
Methylene chloride (CH2Cl?) and acetone (C?H?O) create a powerful paint remover...
Engineer Builds His Own X-Ray After Hospital Charges Him $69K
Researchers create 2D nanomaterials with up to nine metals for extreme conditions
The Evolution of Electric Motors: From Bulky to Lightweight, Efficient Powerhouses
3D-Printing 'Glue Gun' Can Repair Bone Fractures During Surgery Filling-in the Gaps Around..
Kevlar-like EV battery material dissolves after use to recycle itself
Laser connects plane and satellite in breakthrough air-to-space link
Lucid Motors' World-Leading Electric Powertrain Breakdown with Emad Dlala and Eric Bach
Murder, UFOs & Antigravity Tech -- What's Really Happening at Huntsville, Alabama's Space Po
The Straits of Bab al Mandab bridge would be intercontinental bridges between the Arabian Peninsula and the Horn of Africa and would cross the Red Sea. A Gibraltar bridge would be between Spain and Morocco would connecting the Atlantic Ocean to the Mediterranean Sea.
Several engineers have advanced designs for the Gibraltar Bridge on various alignments and with differing structural configurations. Professor T.Y. Lin's proposal for a crossing between Point Oliveros and Point Cires was designed with 14,000 meter length, deep piers, and 5000-meter spans.
10 GPa-strong carbon nanotube fibers are today available (Koziol et al 2007), suggesting that long cables with a similar strength could be realized in the near future. Those new materials could make super-bridges more feasible.
OPAC Engineers ere engaged by Professor Lin to study structural configurations, stiffening systems, and aerodynamic performance issues for the Oliveros-Cires crossing's 5000 m spans. Professor Lin's proposed a hybrid stayed-suspension bridge concept. The hybrid stayed-suspension bridge was developed into the most suitable alternative, with greater rigidity and better aerodynamic characteristics than competing systems with much smaller spans. They estimated a $15 billion cost.