>
When Corporations Resist the State: Ethics, AI, and the Limits of Government Power
The #1 Best Potassium Food on Earth (It's Not Bananas)
America Dependent On Chinese Electrical Parts For AI Build-Out
DARPA O-Circuit program wants drones that can smell danger...
Practical Smell-O-Vision could soon be coming to a VR headset near you
ICYMI - RAI introduces its new prototype "Roadrunner," a 33 lb bipedal wheeled robot.
Pulsar Fusion Ignites Plasma in Nuclear Rocket Test
Details of the NASA Moonbase Plans Include a Fifteen Ton Lunar Rover
THIS is the Biggest Thing Since CGI
BACK TO THE MOON: Crewed Lunar Mission Artemis II Confirmed for Wednesday...
The Secret Spy Tech Inside Every Credit Card
Red light therapy boosts retinal health in early macular degeneration

Any one of these projects would have been the largest battery storage facility ever built. Combined, they amount to 15 percent of the battery storage installed planet-wide last year.
The new battery projects were commissioned in response to a fossil-fuel disaster—the natural gas leak at Aliso Canyon, near the Los Angeles neighborhood of Porter Ranch. It released thousands of tons of methane into the air before it was sealed last February.
In its wake, Southern California Edison (SCE) rushed to deploy energy storage deals to alleviate the risk of winter blackouts. There wasn't any time to waste: All of the projects rolling out this week were completed within 6 months, an unprecedented feat. Tesla moved particularly nimbly, completing in just three months a project that in the past would have taken years.
The battery storage industry—a key part of the plan if wind and solar power are to ever dominate the grid—is less than a decade old and still relatively small. Until recently, batteries were many times more expensive than natural gas "peaker" plants that fire up to meet surging demand in the evening and morning hours.