>
Putin Ally Makes Surprise Nuclear Move
Plans for larger, higher Baltimore bridge keep channel clear for ships
Expert Insight: The "Bitcoin Jesus" Tax Indictment | Roger Keith Ver's Covered Expatri
Final proof Biden's America is utterly adrift, ignored - and barrelling toward disaster:
The first reverse microwave in the U.S.: you can have it at home to save energy while cooking
BREAKTHROUGH : Lightsolver Makes Ultrafast Laser Based Computers
$300,000 robotic micro-factories pump out custom-designed homes
$300,000 robotic micro-factories pump out custom-designed homes
Skynet Has Arrived: Google Follows Apple, Activates Worldwide Bluetooth LE Mesh Network
The Car Fueled Entirely by the Sun Takes Huge Step Towards Production
A new wave of wearable devices will collect a mountain on information on us...
Star Trek's Holodeck becomes reality thanks to ChatGPT and video game technology
Blazing bits transmitted 4.5 million times faster than broadband
According to Bloomberg's ship tracking data, four of seven ships trapped at the port navigated the new temporary channel and are sailing down the Chesapeake Bay.
On Thursday, the Balsa 94, a bulk carrier sailing under a Panama flag, transited the temporary channel for Saint John, Canada. Three other ships, including the Saimaagracht cargo vessel, the Carmen vehicle carrier, and the Phatra Naree bulk carrier, were also able to exit.
The new 35-foot depth channel is a massive increase compared to smaller channels opened several weeks after the Dali container ship slammed into the bridge one month ago, toppling the bridge and paralyzing the port.
"While this is a significant achievement, we have a long way to go, and Unified Command is committed to fully opening the channel by the end of May," US Coast Guard Cmdr. Baxter Smoak told reporters.
Next week, salvage crews expect to refloat Dali, which will then be pushed back to port by tugboats for inspection. Once Dali and all debris are removed, the main shipping channel could reopen next month.
However, Ben Schafer, an engineering professor at Johns Hopkins University, told AP News that a new bridge could take five to seven years to be rebuilt.
"The lead time on air conditioning equipment right now for a home renovation is like 16 months, right?" Schafer said.
He continued: "So it's like you're telling me they're going to build a whole bridge in two years? I want it to be true, but I think empirically it doesn't feel right to me."
The general cargo ship Balsa 94 becomes the first ship to use the @portofbalt's 35-foot-deep Limited Access Channel promised by the @USACEHQ by the end of April. The ship had been stuck in the harbor since the March 26 collapse of the Key Bridge.
— gCaptain (@gCaptain) April 25, 2024
Updated story here:… pic.twitter.com/LZeE9o5rne