>
Planned Parenthood Warns Funding Cut Will Result In Birth Of Thousands Of Babies
CIA: Our Trump-Russiagate Claims Were Corrupt, Our Claims On Iran Are …
Spying on Iran: How MI6 infiltrated the IAEA
Slate Truck's Under $20,000 Price Tag Just Became A Political Casualty
xAI Grok 3.5 Renamed Grok 4 and Has Specialized Coding Model
AI goes full HAL: Blackmail, espionage, and murder to avoid shutdown
BREAKING UPDATE Neuralink and Optimus
1900 Scientists Say 'Climate Change Not Caused By CO2' – The Real Environment Movement...
New molecule could create stamp-sized drives with 100x more storage
DARPA fast tracks flight tests for new military drones
ChatGPT May Be Eroding Critical Thinking Skills, According to a New MIT Study
How China Won the Thorium Nuclear Energy Race
Sunlight-Powered Catalyst Supercharges Green Hydrogen Production by 800%
This means Tesla will have 4680 at reasonable scale and car ready in 2021. This is not the 12-18 month timeframe from the last earnings call. This means not 11-17 months from today but less than 7 months. This is also confirming Texas production later this year.
Texas will also have front and rear gigacasting.
The 4680 cells means the Model Y from Austin will have the structural battery. The front and rear casting will massively reduce cost and weight. There will also be weight reduction from the structural battery. These all combine for a lighter, lower cost and longer range vehicle.
Having large-scale 4680 cells will mean Tesla will have the battery supply for Cybertruck and Semi products at scale in 2022.