>
Dr. Ken Berry: Stop Eating the Sugar and Starch. This Drops Blood Sugar Faster Than Any Pill
The Illusion of American Power Is Crumbling
Diesel Prices Are Surging. This Electric Trucking Company Is Seeing More Interest
Solid-State Cells Can Make The U.S. Competitive In Batteries Again: CEO
Jetson ONE personal eVTOL pod is about to go full sky patrol
America's INSANE BREAKTHROUGH Could Replace Septic Tanks Forever
Amazing DIY Building Material for Home & Yard - Inexpensive and Easy!
Researchers have discovered a massive deposit of hidden water...
Amazon's Ring Unveils Flying Drone And Robot To Patrol Homes And Businesses
Anthropic Strikes $3.4 Billion Off-Grid Power Agreement to Bypass U.S. Grids, Reports Say
The X-ray room just shrank to the size of a laptop
Dead Simple Apocalypse Power: Build It in an Hour
Gritt and MasTec partner to bring physical AI to solar construction sites
Baby it's cold INSIDE! Scientists create the coldest temperature ever recorded in the lab...

This means Tesla will have 4680 at reasonable scale and car ready in 2021. This is not the 12-18 month timeframe from the last earnings call. This means not 11-17 months from today but less than 7 months. This is also confirming Texas production later this year.
Texas will also have front and rear gigacasting.
The 4680 cells means the Model Y from Austin will have the structural battery. The front and rear casting will massively reduce cost and weight. There will also be weight reduction from the structural battery. These all combine for a lighter, lower cost and longer range vehicle.
Having large-scale 4680 cells will mean Tesla will have the battery supply for Cybertruck and Semi products at scale in 2022.